INES directory

On this page you can browse the directory of reported nuclear and radiation incidents reported to the IAEA.

Please be aware that this directory is not complete, certainly not below INES-2, as different national regulatory bodies have different measures as to what to report to the IAEA and what not.

It is also possible to check a map with all reported the incidents.

To get notified of nuclear incidents as they are added to the directory, follow @ines_events on Twitter or through the RSS-feed.

You don't have Javascript enabled. Hover for more information! But don't worry: you can still use this web site! You have two options:
  • enable Javascript in your browser and then refresh this page, for a much enhanced experience.
  • click the Update button every time you want to update the selection.
Event date Location Incident INES level
1993-02-28 RINGHALS-1 MINOR LEAKAGE IN A 32 MM VALVE BONNET SEAL
1993-02-27 NARORA-2 WATER INGRESS IN ION CHAMBER HOUSING OF CHANNEL B & E OF REACTOR REGULATING AND PROTECTIVE SYSTEM 1
1993-02-25 LOVIISA-2 FEEDWATER PIPE RUPTURE 2
1993-02-24 OSKARSHAMN-1 CRACKS IN PIPEBENDS (ELBOWS) IN THE RESIDUAL HEAT REMOVAL SYSTEM 1
1993-02-23 BOHUNICE-2 FALL DOWN OF CONNECTOR FRAGMENTS INTO THE REACTOR VESSEL 1
1993-02-15 DARLINGTON-2 UNIT SHUTDOWN DUE TO HEAVY WATER LEAK AT A FUELLING MACHINE
1993-02-12 BNFL, Sellafield PLUTONIUM RECOVERY PLANT, B204 1
1993-02-12 BNFL, Sellafield OVEREREXPOSURE OF A RADIOGRAPHY INSPECTOR AS A RESULT OF A WOUND 2
1993-02-09 TIHANGE-1 FIRE IN A NON-SAFETY RELATED CABINET IN THE CONTROLLED AREA
1993-02-07 THREE MILE ISLAND-1 UNAUTHORIZED INTRUDER INTO PLANT PROTECTED AREA WHILE OPERATING AT 100 PERCENT POWER [N/A]
1993-02-02 KOLA-3 UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO 1
1993-02-02 KOLA-1 UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO 3
1993-02-02 KOLA-2 UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO 3
1993-02-02 TRIGA MARK II CAPSULE BREAKAGE IN CENTRAL THIMBLE 2
1993-02-02 KOLA-4 UNIT SCRAM CAUSED BY GRID DISTURBANCES DUE TO TORNADO 1
1993-01-23 RINGHALS-1 INSUFFICIENT CONTROL ROD FUNCTION DURING HOT START UP TEST
1993-01-20 PALUEL-2 SUB-COOLING OF THE REACTOR COOLANT SYSTEM DURING A TEST 2
1993-01-17 RAJASTHAN-2 NON-AVAILABILITY OF CHANNEL TEMPERATURE MONITORING (CTM) INSTALLATION-2
1993-01-16 KALPAKKAM-2 NON TRIPPING OV CHANNEL-E ON HIGH BOILER DIFFERENTIAL TEMPERATURE WHILE DOING TESTING
1993-01-14 CHERNOBYL-3 WOODEN SLEEPERS STORED AT THE SEPARATING WALL BETWEEN UNITS 3 & 4 CAUGHT FIRE