INES directory

On this page you can browse the directory of reported nuclear and radiation incidents reported to the IAEA.

Please be aware that this directory is not complete, certainly not below INES-2, as different national regulatory bodies have different measures as to what to report to the IAEA and what not.

It is also possible to check a map with all reported the incidents.

To get notified of nuclear incidents as they are added to the directory, follow @ines_events on Twitter or through the RSS-feed.

You don't have Javascript enabled. Hover for more information! But don't worry: you can still use this web site! You have two options:
  • enable Javascript in your browser and then refresh this page, for a much enhanced experience.
  • click the Update button every time you want to update the selection.
Event date Location Incident INES level
1995-05-14 BRUCE-5 SPURIOUS OPENING OF REACTOR COOLANT LIQUID RELIEF VALVE 1
1995-05-08 TARAPUR WASTE IMM. PLANT INADVERTENT DISCHARGE OF LIQUID RADIOACTIVE WASTE 1
1995-05-02 DUKOVANY-1 SHORT VIOLATION OF LIMITS AND CONDITIONS DUE TO ONE AND A HALF HOUR UNAVAILABILITY OF 2 OUT OF 3 SAFETY SYSTEMS 1
1995-05-01 BNFL SPRINGFIELDS ELEVATED URANIUM LUNG BURDEN 2
1995-04-27 BOHUNICE-2 REACTOR SCRAM DUE TO A REACTOR PROTECTION SPURIOUS SIGNAL
1995-04-27 YONGGWANG-3 REACTOR TRIP DUE TO FEEDWATER CONTROL VALVE CLOSURE
1995-04-09 RINGHALS-2 UNSUCCESSFUL SWITCH OVER FROM 400 KV TO 130 KV
1995-04-03 KORI-3 REACTOR TRIP DUE TO MAIN FEEDWATER PUMPS STOP
1995-03-31 OSKARSHAMN-1 CRACKS IN PUMP AND VALVE CASINGS
1995-03-30 KRSKO UNIT SCRAM FOLLOWING THE LOSS OF OFF-SITE POWER
1995-03-25 WATERFORD-3 GASEOUS RELEASE FROM NEARBY CHEMICAL PLANT [N/A]
1995-03-24 BNFL, Sellafield CONFIRMED DOSE ABOVE STATUTORY DOSE LIMIT PROBABLY DUE TO A WOUND 2
1995-03-08 YONGGWANG-2 REACTOR TRIP DUE TO ACTUATION OF GROUND FAULT RELAY
1995-02-25 KORI-2 SAFETY INJECTION DUE TO PRESSURIZER SPRAY VALVE STACK
1995-02-23 BIBLIS-B SMALL LEAKAGE OF PRIMARY COOLANT AT NPP BIBLIS, UNIT B
1995-02-14 GUANGDONG-1 DROP TIME OF CONTROL RODS OUT OF CRITERION 1
1995-02-13 H.B. ROBINSON-2 CARBON DIOXIDE RELEASE TO A PLANT VITAL AREA [N/A]
1995-02-12 RINGHALS-3 NOT FULLY INSERTED CONTROL RODS 1
1995-02-07 KALPAKKAM-2 STEAM GENERATOR TUBE LEAK AT MAPS-2
1995-01-29 CHERNOBYL-3 HUMAN ERROR INITATED REACTOR TRIP 1